mirror of
https://github.com/bringout/oca-mrp.git
synced 2026-04-24 20:12:03 +02:00
Initial commit: OCA Mrp packages (117 packages)
This commit is contained in:
commit
277e84fd7a
4403 changed files with 395154 additions and 0 deletions
|
|
@ -0,0 +1,11 @@
|
|||
MRP Areas
|
||||
~~~~~~~~~
|
||||
|
||||
* Go to *Manufacturing > Configuration > MRP Areas* and define or edit
|
||||
any existing area. You can specify the working hours for every area.
|
||||
|
||||
Product MRP Area Parameters
|
||||
~~~~~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
* Go to *Manufacturing > Master Data > Product MRP Area Parameters* and set
|
||||
the MRP parameters for a given product and area.
|
||||
|
|
@ -0,0 +1,7 @@
|
|||
* Wim Audenaert <wim.audenaert@ucamco.com>
|
||||
* Jordi Ballester <jordi.ballester@forgeflow.com>
|
||||
* Lois Rilo <lois.rilo@forgeflow.com>
|
||||
* Héctor Villarreal <hector.villarreal@forgeflow.com>
|
||||
* Christopher Ormaza <chris.ormaza@forgeflow.com>
|
||||
* Joan Sisquella <joan.sisquella@forgeflow.com>
|
||||
* Alexandre Fayolle <alexandre.fayolle@camptocamp.com>
|
||||
|
|
@ -0,0 +1,17 @@
|
|||
This module allows you to calculate, based in known inventory, demand, and
|
||||
supply, and based on parameters set at product variant level, the new
|
||||
procurements for each product.
|
||||
|
||||
To do this, the calculation starts at top level of the bill of material
|
||||
and explodes this down to the lowest level.
|
||||
|
||||
Key Features
|
||||
------------
|
||||
|
||||
* MRP parameters set by product variant MRP area pairs.
|
||||
* Cron job to calculate the MRP demand.
|
||||
* Manually calculate the MRP demand.
|
||||
* Confirm the calculated MRP demand and create PO's, or MO's.
|
||||
* Able to see the products for which action is needed throught Planned Orders.
|
||||
* Integration with `Stock Demand Estimates <https://github.com/OCA/stock-logistics-warehouse/tree/12.0/stock_demand_estimate>`_ system.
|
||||
Note: You need to install `mrp_multi_level_estimate module <https://github.com/OCA/manufacture/tree/12.0/mrp_multi_level_estimate>`_.
|
||||
|
|
@ -0,0 +1,117 @@
|
|||
13.0.1.5.0 (2020-04-09)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
**Features**
|
||||
|
||||
- Show *Run MRP Multi Level* menu only to a specific new security group *Run MRP Manually*. (`#492 <https://github.com/OCA/manufacture/issues/492>`_)
|
||||
|
||||
|
||||
13.0.1.4.0 (2020-03-26)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
* Add menu entry for planned orders
|
||||
* Add button to navigate from planned orders to linked manufacturing orders
|
||||
* Add action to convert planned orders to fixed
|
||||
* When changing the due date in a planned order the release date is recomputed
|
||||
|
||||
13.0.1.3.0 (2020-03-02)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
* [IMP] Minor changes"
|
||||
(`#470 <https://github.com/OCA/manufacture/pull/470>`_).
|
||||
|
||||
* Planned Order release and due date become required.
|
||||
* Add button to Product MRP Area to update MOQ from Supplier Info.
|
||||
* Link Manufacturing Orders with Planned Orders.
|
||||
* Allow Mrp Inventory Procure Wizard to be used from other models.
|
||||
* Make MRP Inventory creation more extensible.
|
||||
* Main Supplier computation (v13 requires explicit False definitions)
|
||||
|
||||
13.0.1.2.0 (2020-02-20)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
* [IMP] Minor changes
|
||||
(`#468 <https://github.com/OCA/manufacture/pull/468>`_).
|
||||
|
||||
* Planned Orders become fixed on manual creation by default
|
||||
* Released Quantity becomes readonly
|
||||
* Add product reference if Planned Order name is not defined on bom explosion
|
||||
|
||||
13.0.1.1.0 (2020-02-21)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
* [FIX] Minor changes
|
||||
(`#469 <https://github.com/OCA/manufacture/pull/469>`_).
|
||||
|
||||
* Fix Main supplier computation in multi company
|
||||
* Drop Triplicated field in search view
|
||||
|
||||
|
||||
* [IMP] Minor changes
|
||||
(`#463 <https://github.com/OCA/manufacture/pull/463>`_).
|
||||
|
||||
* Show supply method on MRP Inventory
|
||||
* Allow no-MRP users to look into Products
|
||||
|
||||
13.0.1.0.0 (2019-12-18)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
* [MIG] Migration to v13.
|
||||
|
||||
12.0.1.0.0 (2019-08-05)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
* [MIG] Migration to v12:
|
||||
|
||||
* Estimates as a forecasting mechanism is moved to a new module
|
||||
(mrp_multi_level_estimate).
|
||||
|
||||
11.0.3.0.0 (2019-05-22)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
* [REW/IMP] Rework to include Planned Orders.
|
||||
(`#365 <https://github.com/OCA/manufacture/pull/365>`_).
|
||||
* [IMP] Able to procure from a different location than the area's location.
|
||||
|
||||
11.0.2.2.0 (2019-05-02)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
* [IMP] Able to run MRP only for selected areas.
|
||||
(`#360 <https://github.com/OCA/manufacture/pull/360>`_).
|
||||
|
||||
11.0.2.1.0 (2019-04-02)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
* [IMP] Implement *Nbr. Days* functionality to be able to group demand when
|
||||
generating supply proposals.
|
||||
(`#345 <https://github.com/OCA/manufacture/pull/345>`_).
|
||||
|
||||
11.0.2.0.0 (2018-11-20)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
* [REW] Refactor MRP Area.
|
||||
(`#322 <https://github.com/OCA/manufacture/pull/322>`_):
|
||||
|
||||
* MRP product concept dropped in favor of *Product MRP Area Parameters*.
|
||||
This allow to set different MRP parameters for the same product in
|
||||
different areas.
|
||||
* Menu items reordering.
|
||||
|
||||
11.0.1.1.0 (2018-08-30)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
* [FIX] Consider *Qty Multiple* on product to propose the quantity to procure.
|
||||
(`#297 <https://github.com/OCA/manufacture/pull/297>`_)
|
||||
|
||||
11.0.1.0.1 (2018-08-03)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
* [FIX] User and system locales doesn't break MRP calculation.
|
||||
(`#290 <https://github.com/OCA/manufacture/pull/290>`_)
|
||||
* [FIX] Working Hours are now defined only at Warehouse level and displayed
|
||||
as a related on MRP Areas.
|
||||
(`#290 <https://github.com/OCA/manufacture/pull/290>`__)
|
||||
|
||||
11.0.1.0.0 (2018-07-09)
|
||||
~~~~~~~~~~~~~~~~~~~~~~~
|
||||
|
||||
* Start of the history.
|
||||
|
|
@ -0,0 +1,12 @@
|
|||
To manually run the MRP scheduler:
|
||||
|
||||
#. Go to *Manufacturing > Operations > Run MRP Multi Level*.
|
||||
#. On the wizard click *Run MRP*.
|
||||
|
||||
To launch replenishment orders (moves, purchases, production orders...):
|
||||
|
||||
#. Go to *Manufacturing > Operations > MRP Inventory*.
|
||||
#. Filter with *To procure*.
|
||||
#. Select multiple records and click on *Action > Procure* or click the right
|
||||
hand side gears in any record.
|
||||
#. On the wizard, check everything is ok and click *Execute*.
|
||||
Loading…
Add table
Add a link
Reference in a new issue